Photo 1: A Ventile "Windy" Jacket
Photo 2: Fixing the antennae together.
Photo 3: Final bolts before lifting.
Photo 4: Antennae lifted
Photo 5: Working at height
Photo 6: Up the tower
Photo 7: Tag line
Photo 8: Leaving the place of work
Photo 9: Job done, All 16 Array towers erected in one week.
Photo 10: (Me) Surveying the finished Array.
Photo 2: Fixing the antennae together.
Photo 3: Final bolts before lifting.
Photo 4: Antennae lifted
Photo 5: Working at height
Photo 6: Up the tower
Photo 7: Tag line
Photo 8: Leaving the place of work
Photo 9: Job done, All 16 Array towers erected in one week.
Photo 10: (Me) Surveying the finished Array.